Skip to main content
This is a sample extraction report with fictional data. Try SkipEntry on your own invoices
← All samples

Extraction Report

PCB-23-1104 — Pacific Coast Builders LLC

Math Warning3 Pages
Extracted Fields
Vendor Name
Pacific Coast Builders LLC
98%
Vendor Address
1830 Harbor Blvd, Suite 210, Costa Mesa, CA 92627
96%
Invoice Number
PCB-23-1104
99%
Invoice Date
2024-10-28
99%
Due Date
2024-11-27
95%
Payment Terms
Net 30
88%
PO Number
WO-2024-1147
97%
Project Reference
Riverside Office Buildout
91%
Currency
USD
99%
Subtotal
$47,845.00
98%
Tax Rate
8.25%
94%
Tax Amount
$3,946.71
97%
Total Due
$51,791.71
97%
Page 1Demolition & Site Prep (7 items)
DescriptionQtyUnitUnit PriceLine TotalConfidence
Demolition - interior walls, 2nd floor east wing1lot$3400.00$3,400.0098%
Debris removal and disposal (8 loads)8load$185.00$1,480.0097%
Temporary dust barriers and HVAC protection1lot$650.00$650.0099%
Site supervision - demolition phase (24 hrs)24hr$95.00$2,280.0098%
Electrical disconnect and cap-off (14 circuits)14ea$120.00$1,680.0097%
Plumbing disconnect - 2nd floor restrooms1lot$1250.00$1,250.0095%
Asbestos testing and abatement1lot$2200.00$2,200.0096%
Page 2Rough Construction (8 items)
DescriptionQtyUnitUnit PriceLine TotalConfidence
Metal stud framing - new office partitions1,200sf$3.75$4,500.0097%
Drywall - 5/8in Type X, both sides2,400sf$1.83$4,400.0085%
Acoustic insulation - R-13 batts1,200sf$1.10$1,320.0093%
Fire-rated door assemblies, 90-min3ea$875.00$2,625.0096%
Hollow metal frames, 3-0 x 7-03ea$310.00$930.0097%
Rough electrical - new circuits (18 runs)18ea$225.00$4,050.0094%
Rough plumbing - break room and restroom1lot$2800.00$2,800.0096%
HVAC ductwork modifications1lot$2250.00$2,250.0062%
Page 3Finishes & Miscellaneous (7 items)
DescriptionQtyUnitUnit PriceLine TotalConfidence
Drywall taping, mudding, and sanding2,400sf$0.85$2,040.0088%
Primer and paint - 2 coats, walls and ceilings2,400sf$1.15$2,760.0087%
ACT ceiling grid and tile installation800sf$3.50$2,800.0082%
Permit fees and inspections1lot$975.00$975.0099%
Project management - construction phase (22 hrs)22hr$110.00$2,420.0078%
Mobilization and equipment rental1lot$622.50$622.5095%
Final cleanup and punchlist1lot$400.00$400.0097%
Invoice Totals
Stated Subtotal$47,845.00
Calculated Subtotal$47,832.50
Tax (8.25%)$3,946.71
Total Due (as stated)$51,791.71
Math Validation
!Line item subtotal ($47,832.50) differs from stated subtotal ($47,845.00) — $12.50 discrepancy
Tax calculation: $47,845.00 x 8.25% = $3,947.21 (stated: $3,946.71 — $0.50 rounding difference)
Subtotal + Tax = Total: $47,845.00 + $3,946.71 = $51,791.71 (matches)
Export

Export is disabled on sample reports. Sign up to export your own extractions.

Want to try it on your own invoices?

Start free — 100 pages, no credit card.